Skip to product information
Next-GEN Smart GPS Tracker for Dogs [36 Month Membership Included] Real-Time Location Tracking with Escape Alerts, Health Monitoring, Waterproof, iOS & Android App, for Dogs 35lbs+(White
$330.00
Sale price
$330.00
Regular price
About This
- DBDD Tracker Series 3+: NEXT-GEN GPS TRACKER: REAL-TIME LOCATION & HISTORY Pinpoint your dog's exact location in real-time, with no distance limits. Our highly advanced GPS in the DBDD Collar Series 3+ provides accuracy and a detailed activity history, so you'll always know where they are and where they've been.
- Smart Virtual Fence: Easily draw a Virtual Fence around your yard in the app. If your dog crosses the boundary, get an instant alert on your phone. It's the an easy way to keep them safe and your mind at ease.
- 24/7 Health Monitoring & Instant Pet Assistant Access: Keep your pet's health in check with continuous, real-time tracking. Enjoy peace of mind monitoring your dog’s well-being around the clock. Whenever you have a question, get on-demand guidance and immediate insights from our built-in Pet Assistant for practical advice right at your fingertips.
- The Premier Multi-Pet Monitoring Solution: Simplify your life with our unique All-Device Mode. Instead of juggling separate screens, you can now watch every pet's location on a single, easy-to-read map. Whether at the dog park or in your backyard, enjoy clear visibility and peace of mind, knowing your whole family is safe together.
- Lightweight, Waterproof, Adventure-Ready: At only 0.1 pounds, this waterproof and dustproof collar is perfect for every escapade. Whether it's a backyard escape, a forest hike, or a dusty road trip, your active pet and inner escape artist are keeps them protected. Plus, it gets smarter with free updates.
Overview
- Brand : DBDD
- Special Feature : Geo-Fence, Real Time Tracking, Rechargeable
- Connectivity Technology : Cellular
- Supported Application : iOS, Android
- Material : Plastic